Installation of a new reverse osmosis system

  • Customer : BENEO ORAFTI

Date of completion:

June 2023

The company BENEO ORAFTI called on our services for the installation of a fourth reverse osmosis system on their Oreye site.

This project began with detailed on-site studies to better understand the constraints and specificities of the installation. Based on this, we selected the equipment best suited to the client’s needs in terms of flow rate and osmosis water quality.

The next step was to design a layout plan for the various skids, including the reverse osmosis system and the pump, taking into account the possible future integration of a 5th reverse osmosis system.

A detailed plan has also been developed for the integration of new 1 µm pre-filters, thus ensuring efficient and reliable filtration.

With particular care, our team produced the piping and support plans, ensuring a perfect match between the different elements. We have also created detailed isometrics for each line, providing comprehensive plans that make it easier to understand the entire network. Finally, alongside the installation of the reverse osmosis systems, site safety was taken into account, thanks to the designa of detailed plans for various terminals and protection elements.

Throughout the project, our team carries out regular monitoring of the work on site, thus making it possible to verify the compliance of the work with the plans and technical standards in force.

Share this project !

The most recent projects

Installation of a falling-film evaporator

Installation of a falling-film evaporator

Installation of a falling-film evaporator Customer: Biowanze Date of completion: November 2026As part of an initiative to increase the capacity of its distillation unit, BIOWANZE has launched a project aimed at optimizing the performance of its rectification column,...

Design of an industrial fermenter

Design of an industrial fermenter

Design of an industrial fermenter Customer : Biowanze Date of completion: October 2025As part of an initiative to increase its beer production capacity, the company BIOWANZE launched a project to develop a new 4,000 m³ fermenter. Our firm provided the complete...

Replacement of root-cutting machines

Replacement of root-cutting machines

Replacement of root-cutting machines Customer: Raffinerie Tirlemontoise Date of completion: September 2024Every day, Raffinerie Tirlemontoise processes tens of thousands of tonnes of sugar beet into sugar. To optimize its processing campaign and ensure reliable,...