Pump replacement
- Customer: BENEO ORAFTI
Date of completion:
July 2022
This oligofructose transfer line connects several storage silos to the processing unit. Given the food-grade nature of the treated product, the entire installation has been studied in compliance with safety standards and the CE 1935/2004 standard. Indeed, all the components used and the installation work comply with the requirements relating to the quality of the materials, as well as the quality of the welds and their processing.
Throughout the project, our team carries out regular monitoring of the work on site, thus making it possible to verify the compliance of the work with the plans and technical standards in force.
Share this project!
The most recent projects
Installation of a falling-film evaporator
Installation of a falling-film evaporator Customer: Biowanze Date of completion: November 2026As part of an initiative to increase the capacity of its distillation unit, BIOWANZE has launched a project aimed at optimizing the performance of its rectification column,...
Design of an industrial fermenter
Design of an industrial fermenter Customer : Biowanze Date of completion: October 2025As part of an initiative to increase its beer production capacity, the company BIOWANZE launched a project to develop a new 4,000 m³ fermenter. Our firm provided the complete...
Replacement of root-cutting machines
Replacement of root-cutting machines Customer: Raffinerie Tirlemontoise Date of completion: September 2024Every day, Raffinerie Tirlemontoise processes tens of thousands of tonnes of sugar beet into sugar. To optimize its processing campaign and ensure reliable,...
ENGINEER CONCEPT srl
![]() |

Head office
Chaussée de Frasnes 8
7911 Hacquegnies, Belgium
Operational headquarters
Rue Jean Jaurès, 10 b
Bureau 13
7350 Thulin, Belgique
© Copyright – ENGINEER CONCEPT srl | Legal notice | Changing consent | Powered by Tragg


