Pump replacement
- Customer: BENEO ORAFTI
Date of completion:
July 2022
This oligofructose transfer line connects several storage silos to the processing unit. Given the food-grade nature of the treated product, the entire installation has been studied in compliance with safety standards and the CE 1935/2004 standard. Indeed, all the components used and the installation work comply with the requirements relating to the quality of the materials, as well as the quality of the welds and their processing.
Throughout the project, our team carries out regular monitoring of the work on site, thus making it possible to verify the compliance of the work with the plans and technical standards in force.
Share this project!


The most recent projects
Installation of a new reverse osmosis system
Installation of a new reverse osmosis system Customer : BENEO ORAFTI Date of completion: June 2023The company BENEO ORAFTI called on our services for the installation of a fourth reverse osmosis system on their Oreye site. This project began with detailed on-site...
New vertical diffusion
New vertical diffusion Customer : Raffinerie Tirlemontoise Date of completion: June 2023We were approached by the company Raffinerie Tirlemontoise to replace two horizontal diffusions with a vertical diffusion. Our support began with monitoring the civil engineering...
Addition of a sand filter
Addition of a sand filter Customer: BIOWANZE Date of completion : July 2020Known for its exploitation of new energy sources from renewable energies, the company BIOWANZE called on our expertise for the extension of its water treatment unit in the wastewater treatment...
ENGINEER CONCEPT srl
![]() |
Head office
Chaussée de Frasnes 8
7911 Hacquegnies, Belgium
Operational headquarters
Rue Jean Jaurès, 10 b
Bureau 13
7350 Thulin, Belgique
© Copyright – ENGINEER CONCEPT srl | Legal notice | [rcb-consent type=”change” tag=”a” text=”Changing consent”] | Powered by Tragg