ATELIER HANOT FRERES, a company specializing in the manufacture and erection of steel structures, as well as in welding work, called on our services for the design of a Berlin wall.

Our task was to design a Berlin wall to support the surrounding soil during the construction of a concrete basin. To this end, detailed calculation notes were drawn up, in order to accurately assess the forces applied to the wall and guarantee its stability.

At the same time, we drew up precise detail plans that included the dimensions, connections and technical specifications of the wall.

These plans served as a reference for implementation on site, ensuring that the work was carried out to the required standards.

Throughout the project, our team ensured regular monitoring of the work carried out via exchanges with the workshop, enabling us to check that the work complied with the plans and technical standards in force.

Share this project !

View project gallery :

The most recent projects

Addition of a sand filter

Addition of a sand filter

Addition of a sand filter Customer: BIOWANZE Date of completion : July 2020Known for its exploitation of new energy sources from renewable energies, the company BIOWANZE called on our expertise for the extension of its water treatment unit in the wastewater treatment...

Construction of a storage tank

Construction of a storage tank

Construction of a storage tank Customer: BIOWANZE Date of completion: April 2023Our company was selected by BIOWANZE for the engineering of a 3,000 m³ tank for the storage of Protiwanze, a protein-rich animal feed. The foundations of the new reservoir were carefully...

Replacement of sulfuric acid pipes

Replacement of sulfuric acid pipes

Remplacement de tuyauteries d’acide sulfurique Client : BENEO ORAFTI Date de réalisation : 2022 et 2023La société BENEO ORAFTI a fait appel à nos services pour un projet de remplacement de tuyauteries d'acide sulfurique. Les travaux consistent à remplacer environ 575...