Process cyclone replacement

  • Customer : BENEO ORAFTI

Date of completion :

2021 and 2022

BENEO ORAFTI called on us to replace its process cyclones. Our intervention began with on-site studies of the existing installations, as well as a 3D scan of the piping and cyclones to be replaced.

We then defined a new line layout and design, taking into account pipe quality, diameter and thickness, in order to minimize pressure drops, reduce abrasion and ensure fluid flow without the constraints associated with small-radius bends and successions of bends, in order to avoid the frequent blockages encountered by production. Seals specially adapted to the characteristics of the product and the abrasion experienced at the cyclone outlet were also sought.

We then produced detailed 2D and 3D drawings of the new piping, integrating the new cyclones in accordance with the customer’s requirements. Detailed drawings of the supports were also produced.

Finally, we consulted on the various elements required, and regularly monitored the progress of the work. The drawings were also updated to create an AS BUILT file, reflecting the final state of the project.

Share this project !

View the project gallery :

Most recent projects

Addition of a sand filter

Addition of a sand filter

Addition of a sand filter Customer: BIOWANZE Date of completion : July 2020Known for its exploitation of new energy sources from renewable energies, the company BIOWANZE called on our expertise for the extension of its water treatment unit in the wastewater treatment...

Construction of a storage tank

Construction of a storage tank

Construction of a storage tank Customer: BIOWANZE Date of completion: April 2023Our company was selected by BIOWANZE for the engineering of a 3,000 m³ tank for the storage of Protiwanze, a protein-rich animal feed. The foundations of the new reservoir were carefully...

Replacement of sulfuric acid pipes

Replacement of sulfuric acid pipes

Remplacement de tuyauteries d’acide sulfurique Client : BENEO ORAFTI Date de réalisation : 2022 et 2023La société BENEO ORAFTI a fait appel à nos services pour un projet de remplacement de tuyauteries d'acide sulfurique. Les travaux consistent à remplacer environ 575...