Construction of an industrial metal canopy

  • Customer: BIOWANZE

Date of completion:

November 2026

As part of measures to secure its facilities and prevent the accumulation of grain material on the bulldozer when it is not in use, BIOWANZE has commissioned us to carry out the technical studies required for the design of an outdoor shelter, to be located near the existing building.

The project includes the construction of a metal canopy designed to protect the bulldozer from the elements, while maintaining a clear line of sight to the machine to facilitate the detection of any potential issues. Furthermore, the safety of the installation is enhanced by the integration of a thermal camera and a sprinkler system, which help to detect and manage risks associated with the accumulation of dust in contact with hot surfaces.

The main constraint of the project lay in the need to schedule on-site work during periods of lower activity, so as not to disrupt daily operations.

This organizational requirement necessitated rigorous preparation for the various implementation phases, as well as the use of prefabricated concrete footings. The construction of the foundations, the assembly of the steel structure, and the installation of the cladding were therefore organized into several successive phases, taking into account the site’s operational constraints.

Furthermore, the studies included surveying and identifying existing drainage networks to precisely determine the depth and orientation of the pipes. This process made it possible to validate the positioning of the foundations and to anticipate potential conflicts with underground utility lines during excavation work and the installation of foundation footings.

Share this project !

The most recent projects

Optimization of a flour transport network

Optimization of a flour transport network

Optimization of a flour transport network Customer: CCB Date of completion: July 2026As part of increasing the capacity of its oven and making its installations more reliable, the CCB company has initiated a project aimed at optimizing its flour transfer network. Our...

Installation of a falling-film evaporator

Installation of a falling-film evaporator

Installation of a falling-film evaporator Customer: Biowanze Date of completion: November 2026As part of an initiative to increase the capacity of its distillation unit, BIOWANZE has launched a project aimed at optimizing the performance of its rectification column,...