ACHIEVEMENTS
Our various ongoing studies
- Pumping station
- Reinforcement of the steel structure of a process plant
- Integration of a 4th decanter in a process plant
- Replacement of process cyclones with optimisation of upstream and downstream pipelines
- Storage tank for animal protein in liquid form, capacity 3,000 m³ with a diameter of 16.2m
- Integration of a new truck loading arm for bio-ethanol
- Bio-ethanol loading station for rail transport,
- Unloading station for wheat delivered by train
- Capacity increase of process lines
- Fire protection network for dust extraction filters in a milling plant
- Various feasibility studies…
Our previous projects and follow-up
- Personal car park with a capacity of 127 spaces, including parking spaces for people with reduced mobility, for rechargeable vehicles, a covered parking area for bicycles and motorbikes with charging stations
- New control room for a workshop to separate gluten and starch from wheat flour
- Workshop for the production of textured proteins, based on gluten and various flours
- Workshop for the production of textured proteins, based on gluten and various flours, Gluten pelletisation workshop,
- Extension of a workshop for the separation of gluten and starch from wheat flour,
- Extension of a milling plant with the integration of 3 lines with a unit capacity of 8 tons per hour,
- Bringing monorails and lifting points into compliance with the regulations, with the drawing up of calculation notes and detailed plans of the modifications to be carried out for approval by an approved body,
- Improvement of process lines for the spacing of periodic stoppages up to 36 months,
- Improvement of process lines with significant capacity increase,
- Integration of hydraulically operated dampers with a dedicated room and hydraulic control unit, in an ash handling line of a biomass boiler, replacing pneumatic dampers,
- Replacement of staff showers with improvements to operating conditions and ergonomics,
- Integration of access and maintenance walkways in the production lines,
- Integration of maintenance monorails,
- Extension of the capacity of a gluten storage facility with the addition of 6 silos with a unit capacity of 360 m³,
- Reallocation of bio-ethanol storage tanks to increase the overall storage capacity of the finished product,
- Handling, screening and storage of limestone,
- Stockpiling and quarrying of limestone,
- Handling, drying and storage of powdered sugar,
- Modification of the feeding of pulp presses and storage of pressed pulp,
- Handling and storage of various products from the sugar industry,
- Storage, dosing and nozzle injection of cement kilns, alternative fuels, in solid, liquid and sludge-paste forms, such as animal meal, fluff, solid waste from various industries, sludge, impregnated sawdust, etc.
- Capacity increase of a grinding line in a cement plant,
- CE and ATEX compliance of alternative fuel handling and dosing lines,
- Audit and/or EC compliance of handling lines using belt conveyors in particular,
- Truck unloading, storage, extraction, dosing and handling of iron sulphate, for injection into the cement process to neutralise Chromium 6,
- Port unloading hopper with a capacity of 600 m³, for various types of powder, with independent autonomous dust removal,
- Salt ship unloading lines, with dosing, mixing with saturated brine and hydraulic transfer to the plant saturator …